Portable Classrooms

Union Bridge, MD

The Challenge

Uniontown Bible Church needed additional space for their expanding youth bible study program. The portable classroom requirements needed to include HVAC, large windows, durable doors and locks, technology and IT closets, durable floors and wall coverings, and adequate lighting.

The Solution

Modular Genius, Inc. provided two portable classrooms inclusive of prefabricated aluminum steps and ADA ramps, on time and per contract. The 864 sq. ft. classrooms were manufactured, delivered, and installed on site within 90 days of notice to proceed.