Government Agency Modular Field Office

U.S. Government

The Challenge

A government agency needed to install a prefabricated field office at a testing range. The building required a high load bearing floor for equipment.

The Solution

Modular Genius provided a 1,440 sq. ft. relocatable modular office. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 60 days from notice to proceed.