A military base in Washington, DC was undergoing renovations for two existing office buildings, and needed a temporary swing space for offices that were under…
Read More
A government agency at Pisgah National Forest in North Carolina needed to replace an old building that was used as office space for park rangers.
Read More
At their remote mountain mining location in Pennsylvania, Specialty Granules needed office space quickly.
Read More
A government agency needed to install a field office at testing range.
Read More
A police department in Sumter, South Carolina needed a building for firearms training.
Read More
Bucks County Transport in Quakertown, PA needed to replace an existing modular office on their site.
Read More
After a tornado damaged their building, Beechnut Kennels needed a replacement to continue their day-to-day operations.
Read More
The District of Columbia’s Office of Contracting and Procurement was seeing a contractor to provide, outfit, deliver, and install a fully functional modular break room.
Read More
The District of Columbia’s Office of Contracting and Procurement was seeing a contractor to provide, outfit, deliver, and install a fully functional modular office.
Read More
A industrial manufacturing facility was in need of additional office space to be located within their compound.
Read More
Located in the waters of the Chesapeake Bay, this dredged material refuge serves as a place of learning as well as an expanding home for…
Read More
A leading U.S. aggregates and mining company needed to expand their office operations. The site for the future building had limited access and was off…
Read More
An industrial company that produces highly qualified structural steel and miscellaneous metals needed more office space to house new employees.
Read More
The St. Mary’s County Maryland Sheriff’s office was in need of a community corrections center. The new facility would allow for continued medical and behavioral…
Read More
A marcellus shale company was in need of an office building to accommodate its growing rapidly growing business. Newly acquired land was grubbed & cleared,…
Read More
A large power company needed to replace an aging training facility with a modern modular building on their secure site.
Read More
A government agency in the city of Virginia Beach was in need of a permanent modular building for their public works department. Modular Genius installed…
Read More
In support of major renovations to the Frelinghuysen Middle School, due to enrollment slowly increasing, the Morris School District chose relocatable modular buildings to help…
Read More
WVU Potomac State College was facing a problem that construction could fix. In order for the college to adhere to NCAA Title 9 rules, they…
Read More
This relocatable building is 400 sq. ft. with a pitched roof and porch; a second similar building is joined to it with a boiler room…
Read More
Reagan National Airport is constantly faced with over-crowded parking. The conversion of an existing lot into a valet parking lot was needed to help relieve…
Read More
The Catholic University of America needed temporary construction swing space complying with DC Building Code. The building would be needed for about 5 years, as…
Read More
Covanta Metals, a leader in metal recycling needed office, lab and locker room space to support their team’s new location at the former US Steel…
Read More
Smouse Trailer & Snow Equipment in Mount Pleasant, PA needed to replace their small and cramped office building. They decided to look for a modular…
Read More
The Maryland Port Authority was in need of a permanent modular building to facilitate security clearance at the busy City of Baltimore seaport.
Read More
The Navy required (3) separated and isolated 5,000 SF areas for different segments of their team. While the personnel had a common goal in training…
Read More
A revitalization effort in downtown Norfolk Virginia has culminated with Festevents at Town Point Park. Norfolk Festevents Ltd. is dedicated to producing city celebrations including…
Read More
A leading community focused manufacturer of packaged dry food was in need of additional classroom and office space for their employees. However, site conditions dictated…
Read More
This spring, Salisbury University began their renewed commitment to public radio by replacing Delmarva Public Radio's (WSDL 90.7) out-of-date equipment. In order to replace the…
Read More
Auto Collisions & Mechanics, Inc. had been leasing an office unit for years. The unit was old, showing its age and was cramped for the…
Read More
The Woodford Reserve Distillery, a liquor distillery Kentucky, was in need of small modular building to be used at a barrel transfer center. The modular…
Read More
Pepco, a public utility that supplies electric power to the city of Washington, D.C. and to surrounding communities in Maryland, needed more training space at…
Read More
SEPTA, the Southeastern Pennsylvania Transit Authority, had been leasing a 12’ x 40’ office trailer for many years at their Midvale Depot utility yard in…
Read More
The Northwest Collections facility was looking for additional office space that could be located at their existing collections facility in Baltimore. However, with the existing…
Read More
The Adjutant General’s Office (AGO) was seeking bids for the rental of two (2) modular units. The modular units would be located at The McCrady…
Read More
Potomac Electric Power Company, or PEPCO, a large energy company in DC needed additional employee training space for 5 or more years.
Read More
A Government entity was in need of administrative space to house personal for a period of 1 year on a site that did not have…
Read More
Specialty Granules (“SGI”) is a leading aggregates and mining company supplying specialized products to the North American building materials industry. SGI needed to replace an…
Read More
Pepco (Potomac Electric Power Company) had a security office in Washington, DC that needed to be replaced, the aging 25 year old building was in…
Read More
A trucking company that services the Horse Industry and Mushroom Industry was in need of a new office building.
Read More
Get a FREE Quote in 60 Seconds!
You will receive pricing, a floor plan, specifications, and a brochure showcasing some of the many designs available today.
Address
Corporate Office:
1201 South Mountain Road
Joppa, MD 21085 USA
Directions: Map
Toll Free: 888-420-1113
Contact Us
Latest News
- Modular Genius Awarded Riverside Elementary School Modular Classroom Building ContractMay 24, 2023 - 1:42 pm
- Modular Genius Awarded Kent Island High School Modular Classroom Building ContractMay 17, 2023 - 2:03 pm
- Modular Genius Helps With Habitat for Humanity Modular Home InstallationMay 10, 2023 - 11:01 am