Modular Wastewater Treatment Plant Office

The Challenge

Repeat client AC&E Services, operating at the Sod Run Wastewater Treatment Plant, required a versatile and efficient office solution to support their administrative operations. The facility needed to include six open offices, a break room with a kitchenette, and a single restroom, all while meeting ADA accessibility requirements. Additionally, the client required a modular office that could be delivered and installed quickly with minimal disruption to the busy worksite.

The Solution

A 1,440 sq. ft. modular office building was designed and delivered to meet AC&E Services’ specifications. The facility includes six open offices, a break room complete with a kitchenette, and a single restroom for convenience. ADA-compliant steps ensure accessibility for all users. Built to adhere to all applicable building codes, the modular structure offered a durable, cost-effective, and rapidly deployable solution. Its seamless installation allowed the client to integrate the office space into their operations with minimal impact on the active site.

A Case Study

Modular Wastewater Treatment Plant Office

Related

Case Studies