Permanent Modular Office Complex for Research Facility

The Challenge

A large government biomedical firm was in need of office space for its staff due to the fact that their existing building had reached the end of its use. Modular Genius was the successful bidder on the project. The buildings totaled 6048 SF and are comprised of (2) 42’ x 72’ Modular complexes. The interior layout of the buildings was determined by the Biomedical firm to maximize efficiency and workflow. The fit and finish of the buildings both interior and exterior were utilitarian by design as the buildings are located on Federal property where, durability and function are paramount. The two separate, yet identical buildings were laid out in a ‘T” formation and were connected via a connecting link so that access to the buildings was optimized relative to parking and staff access.

The Solution

Due to an accelerated schedule demands by the owner, Modular construction was the most logical choice since the overall design of the buildings had already been completed. Once the necessary building component selections were complete, both buildings were built in weeks. This was significant considering that the owner required the business use structures to have some non-industry standard requirements. While not completely uncommon, galvanized duct work, remote temperature sensors are not as typical in a modular office building. Prior and Parallel to building production the site was developed to support the buildings. In addition, both buildings had light hazard wet pipe sprinkler systems installed as well as complete fire alarm system that treated both buildings as one structure. Despite extended periods of rain/bad weather, significant unforeseen conditions during the foundation installation, MGI managed to get the buildings installed on schedule.

A Case Study

Permanent Modular Office Complex for Research Facility

Related

Case Studies