Prefabricated Interagency Fire Center
The Challenge
The US Department of the Interior had a requirement to install a field office at a remote location in the desert. The building required durable exterior and interior to weather the harsh conditions.
The Solution
Modular Genius provided a 2,160 sqft modular field office facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 90 days from notice to proceed.