Case Studies School Dormitories

 

Please take a moment to browse our library for projects of interest.

 
PDF DESCRIPTION PREVIEW
Private College - Dormitory

[CHALLENGE] A Pennsylvania College needed additional dormitories to relieve over-crowding for the second half of the school year. The College needed to install rooms during the students' winter break.

[SOLUTION] Modular Genius selected 4 duplex in-stock dormitories from its available inventory and installed the cottages in 3 weeks from the time of order. The students moved into the rooms and the college was able to keep up with the overcrowding without issue.
  Visit the modular building calculator for a FREE QUOTE IN 60 SECONDS.
 
 
 
 
 
 
 
 
 
 
 
 
 
about modular genius | contact modular genius | about modular construction | modular building calculator | sitemap
modular buildings | temporary buildings | relocatable buildings | portable buildings | prefab buildings
modular construction industry news | modular building parts & accessories | portable offices | temporary classrooms
 
© MODULAR GENIUS, INC., 220 Franklin Street, Bel Air, Maryland 21014 | Phone: 410.420.7586 | Fax: 410.420.7594
Web: © launchdm.com - All Rights Reserved.