Delivery day shouldn’t feel mysterious. If you’ve chosen a modular building, shipping and set-up are simply the moment the factory’s hard work meets your site. That’s what you can expect when you turn to Modular Genius, the leader among modular building manufacturers in Washington, DC. Here’s what typically happens when you turn to us.

The Week Before: Simple, Clear Prep

A few days out, we will confirm timing, routes and where trucks will park. You’ll get a plain-language plan for the day: when streets or lots need to be clear, where staff and students should enter, and the best places to watch safely if you’re curious. Utilities and foundation work are already done, so the site is ready. Think of it like setting the stage before the cast shows up.

When The Trucks Roll In

Each module travels on its own trailer. Drivers arrive in a set order, guided by a lead who’s managing the traffic and timing. The modules are wrapped to keep them clean, with doors and windows protected. You’ll also notice smaller deliveries with ramps, steps and connection parts. It looks like a lot, but it’s organized to the minute so nobody’s guessing what comes next. 

The Crane And The Crew

The crew on the ground will walk the site, review wind and weather and set up safety zones. Each module is attached to the crane with heavy straps then lifted gently off the trailer. Spotters talk to the operator by radio as the module rises, swings and settles exactly where it’s supposed to land.

Click, Seal and Secure

Once a module is in place, the team connects it to its neighbor. Crews line up the edges, secure them and start sealing the joints so the building acts as one solid piece. From the outside, you’ll see weatherproofing and trim go on. Inside, teams tie together the hallway floors and ceilings so it feels like a single, continuous room rather than pieces stitched together.

Quiet Connections You Won’t Notice Later

While the crane finishes the heavy lifting, another crew handles connections for power, water, data and heat or cooling. You won’t need to understand the technical details to appreciate the results. By the time the last trailer pulls away, your building is on its permanent base, sealed from the weather and ready for final checks. If you’re adding ramps or a covered walkway, those installers often work in parallel so the whole package comes together quickly. 

Keeping School, Church, Or Business Running

We plan delivery around your schedule. If you’re on a campus, we’ll time the biggest moves outside drop-off and pick-up. If you’re a church or office, we’ll avoid your busiest hours. You’ll get simple signage, flaggers for traffic and a clearly marked viewing area so those who are interested can watch without stepping into the work zone. It’s a big day, but it doesn’t have to disrupt your routine.

What If The Weather Doesn’t Cooperate?

There’s a reason modular projects hit dates so well: most work happened inside the factory. On delivery day, wind is the main factor for a crane. We will only lift when it’s safe. If there’s a delay, we’ll tell you early and shift to the next safe window. You won’t be left guessing.