Modular Classroom Complex

Baltimore, MD

The Challenge

A school district was in need of relocatable modular classroom buildings to be installed during the summer of 2017 when school was out of session. Each classroom needed to be complete with heat and AC, large windows, durable doors and locks, tech and IT closets, durable floors and wall coverings, and proper lighting.

The Solution

Modular Genius, Inc. provided a durable building inclusive of pre-fabricated aluminum steps and ADA ramps, on time and on budge. The 864 sq ft classrooms were manufactured, delivered and installed on site within 90 days of notice to proceed.