[CHALLENGE]
The US Army was updating facilities on an isolated island which required a 2,160 square foot cafeteria/command center for troops training. The building had to be delivered and installed at the remote location in between exercises so as not to disrupt training.
[SOLUTION]
Modular Genius constructed, delivered, and installed the 2,160 square foot facility in 45 days. Work consisted of the building being installed on a foundation, with site built entrance stairs. The project was delivered on time and within budget.
|
|